• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Thursday, February 12, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
No Results
View All Results
  • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
No Results
View All Results
Home Below Rail Infrastructure

Tracklaying on Sydney Metro using custom equipment and automated techniques

by Connor Pearce
October 12, 2020
in Below Rail Infrastructure, Passenger Rail, Rail Supply
Reading Time: 2 mins read
A A
Share on FacebookShare on Twitter

Tracklaying on the new Sydney Metro line from Chatswood to Marrickville will begin soon, with tracklaying to begin in early 2021.

Over 4,000 tonnes of Australian railway steel has been delivered ahead of tracklaying and flashbutt welding will be carried out before the rail is moved into the tunnels.

Other rail systems such as traction power, rigid overhead conductors, and drainage ventilation systems, emergency evacuation and monitoring equipment will be installed by the line-wide contractor Systems Connect.

John Grant, Systems Connect construction manager, said that the complex project required specialised equipment.

“Systems Connect has commissioned custom-designed equipment by Australasian manufacturer, Manco Rail. Specialist plant was commissioned that can operate within the tunnel profile efficiently, safely and to a high standard of emissions, including air and noise,” he said.

The consortium has endeavoured to use automation wherever possible. Part of the track laying systems, such as the sleeper grab straddle, are radio remote controlled. Other equipment in use includes specially converted wheeled excavators, with material handling booms, automatic rail threading units, and rail carrying dollies. A sleeper-laying trailers equipped with sleeper grab straddle, a rail threader trailer, tug units and track guidance system fitted to the above equipment are also in use.

As the project adjoins operating rail networks, possession and access is coordinated months to years in advance.

“Our goal is to ensure that all works are delivered safely and to schedule so train services can resume as normal after the possession,” said Grant.

The combination of planning and equipment is enabling a staged approach to tracklaying, where track and tunnel fit out are completed in sections from between 800 metres and three kilometres in length.

An automated approach will be used from Chatswood to Victoria Cross, underneath North Sydney, and from Marrickville to Martin Place. For these sections, the custom-made Manco equipment will be used.

For the section underneath Sydney Harbour and from Barangaroo to Martin Place, a manual method using small wheeled loaders placing sleepers and rail threading will construct the track.

Recycled materials will also be used throughout the project, with crushed glass used for bedding, haunch, side, and overlay material instead of sand at the Sydney Metro Trains Facility at Rouse Hill. Recycled plastic cable troughing is used in place of galvanised steel.

Tags: John GrantManco RailSydney MetroSystems Connecttracklaying
Premium Ad
20
Private Advertiser

$77,000

2010 GSR PX200

  • » Listing Type: Used
Location marker The shape of a location marker

Alexandra Hills, QLD

**** *** 585
MORE DETAILS
6

POA

2025 HYDREMA MX18G

  • » Listing Type: New
Location marker The shape of a location marker

Bibra Lake, WA

08 6500 0937
MORE DETAILS
11

POA

2021 TADANO AT200 S Super Deck

  • » Listing Type: New
Location marker The shape of a location marker

Lytton, QLD

08 6500 0950
MORE DETAILS
1

POA

SNORKEL MHP13AT

  • » Listing Type: New
Location marker The shape of a location marker

Helensvale, QLD

07 3177 1605
MORE DETAILS
Premium Ad
14

POA

2023 TADANO AT 300CG

  • » Listing Type: New
Location marker The shape of a location marker

Lytton, QLD

08 6500 0950
MORE DETAILS
20

$181,390

2020 OMME MONITOR OMME 2100 EP - 21M TRAILER MOUNTED LIFT

  • » Listing Type: Used
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
5

$1,650

ABBEY D758 CHERRY PICKER

  • » Listing Type: Used
Location marker The shape of a location marker

Trentham, VIC

03 9988 9194
MORE DETAILS
4

$20,000

2012 SNORKEL MHP13/35

  • » Listing Type: Used
Location marker The shape of a location marker

Murarrie, QLD

07 3171 1136
MORE DETAILS
16

POA

2023 PLATFORM BASKET MONITOR 1275 LBP - 12.3M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
24

POA

PLATFORM BASKET MONITOR 3315 LBD - 33M HYBRID SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
19

POA

PLATFORM BASKET MONITOR 2210 EVO - 22M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
20

POA

2022 OMME MONITOR 2750RJ STICK - 27M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS

Related Posts

Work is progressing at the Maidstone Street Level Crossing Removal project site. Image: Victorian Government

Work progresses to remove ‘dangerous’ level crossing

by Kayla Walsh
February 12, 2026

Piling is now complete for the new road bridge in Altona, Victoria marking a major milestone in the removal of...

Testing and commissioning is ramping up on Sydney's Southwest Metro line. Image: Sydney Metro

Southwest Metro hits big testing milestone

by Kayla Walsh
February 12, 2026

A second train has joined the testing fleet on the Southwest Metro line, bringing southwest Sydney a step closer to...

The new train will be inspected, coupled, tested and commissioned at the Wiri Depot before officially entering service. Image: City Rail Link

Final new electric train boosts Auckland fleet ahead of CRL opening

by Kayla Walsh
February 9, 2026

Auckland Transport’s 23rd and final new electric train has been delivered to Port of Auckland.   The three-carriage train, which was built by Spanish...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Rail Express is Australia’s authoritative business to business rail publication. Updated daily, Rail Express provides uniquely extensive and comprehensive balanced coverage of breaking news and trends in key areas such as infrastructure, investment, government policy, regulatory issues and technical innovation.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Rail Express

  • About
  • Advertise
  • Latest Magazine
  • Subscribe
  • Contact
  • Terms & Conditions
  • Privacy Policy
  • Privacy Collection Notice

Popular Topics

  • Events
  • Passenger Rail
  • Freight Rail
  • Engineering
  • Safety, Standards & Regulation
  • Operations & Maintenance

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited