Commitment to sustainability on Queensland’s Cross River Rail (CRR) project has been recognised with one of its major works packages achieving the highest possible design rating.
Read More
Ekka Station not in use for this year’s event
Works are progressing well on Brisbane’s new year-round Ekka station being delivered through Cross River Rail (CRR), with the old station building and platforms demolished, and tracks recently installed over a new 150-metre-long rail bridge that will form part of the new station.
Read More
Read More
‘Mammoth’ task from Cross River Rail crews
Cross River Rail crews have made significant progress at numerous aboveground sites during track closures, working around the clock to complete critical works across Brisbane’s rail corridor.
Read More
Read More
Normanby pedestrian bridge to be removed
An old timber section of bridge built over the rail corridor at the Brisbane hamlet of Normanby will be removed to ensure the ongoing safety of pedestrians in the future.
Read More
Read More
Exhibition line realigned for bridge crossing
Cross River Rail crews have completed one of the longest and most complicated pieces of track work ever undertaken on South East Queensland’s rail network, realigning the Exhibition line to run over a new 150-metre bridge outside the Royal National Agricultural and Industrial Association of Queensland (RNA) Showgrounds.
Read More
Read More
CRR closures for Easter and ANZAC Day
South East Queenslanders are being urged to plan Easter and ANZAC Day travel in advance, with track closures required to allow critical Cross River Rail (CRR) works to be completed safely and efficiently.
Read More
Read More
Cross River Rail costs soar to $6.3b
The costs for Brisbane’s transformative Cross River Rail (CRR) project have blown out by $960 million to an estimated $6.3 billion.
Read More
Read More
Powderfinger guitarists in rock set
Cross River Rail (CRR) has played host to two guitarists from Brisbane’s most iconic rock band, for an incredible one-off performance more than 30 metres below the city in the project’s massive Albert Street cavern.
Read More
Read More
Auchenflower station blooms with accessibility upgrade
A multimillion-dollar makeover to Auchenflower station has been completed, including accessibility upgrades to the gateway of one of Queensland’s busiest medical hubs.
Read More
Read More
Roma Street works hit ground level
Construction works in the 20-metre-deep station box at Cross River Rail’s Roma Street site have reached ground level, marking the mega project’s latest milestone.
Read More
Read More