Below Rail Infrastructure, Engineering, Products & Technology, Signalling & Communications Pandrol APC magnet cuts installation and maintenance costs In many rail networks sections of the overhead catenary are neutral, requiring trains to stop drawing current from the overhead line. Ensuring that no power is drawn prevents the pantograph from arcingRead More Connor PearceFebruary 11, 2020, 8:12 amFebruary 12, 2020