An investigation has found that a loaded coal train collided with the rear of a stationary train in low-light conditions at the Port of Newcastle, NSW, after network control was not advised that the second train was disabled.

Just after 5 am on 29 July 2020, a loaded Pacific National (PN) coal train collided at 16 kilometres per hour with the rear of a stationary One Rail Australia (ORA) coal train, when arriving at Kooragang Coal Terminal, in Newcastle.

The PN locomotive and the two rearmost wagons of the ORA train derailed in the collision, and came into contact with two adjacent stationary trains, which sustained minor damage.

One of the PN drivers sustained minor injuries, and there was substantial damage to the rail infrastructure.

An investigation into the incident was undertaken by the Office of Transport Safety Investigations (OTSI), which conducts rail safety investigations in NSW on behalf of the Australian Transport Safety Bureau.

The investigation found that while the ORA train was unloading, several penalty brake applications associated with a fault in its electronic pneumatic brake system had disabled the train, bringing it to a standstill.

The crew investigated the faults using a series of technical exercises, which caused the train’s End of Train light to be extinguished.

“This disablement of the ORA train constituted a Condition Affecting the Network, but the crew did not report this to the Kooragang Network Controller as they were required to do,” OTSI Chief Investigator Natalie Pelham explained.

“Subsequently, the Kooragang Network Controller set a signal for the PN train to proceed with caution along the arrival road where the ORA train was stationary.”

The terminal area where the accident occurred was poorly lit by artificial trackside lighting, and the absence of an End of Train light at the rear of the stationary train reduced its conspicuity, Dr Pelham explained.

“Light produced by an overhead gantry, above the accident site, may also have caused disabling glare for the drivers of the PN train,” Pelham said.

Since the collision, PN issued notices informing drivers to not exceed eight kilometres per hour upon receiving a shunt proceed signal within Kooragang terminal.

ORA has added programmed monitoring of End of Train lights into its asset management plan, and circulated safety information to their drivers to remind them of the requirement to communicate all conditions affecting the network to network control.

The Australian Rail Track Corporation (ARTC) provided clarification advice to rail operators on the operation of trains with defective EOT lights and updated information contained in the Rail Access Standard (general information). ARTC also plans to review the Kooragang Operations Protocol and conduct a risk assessment to ensure the risk of collision is effectively managed and controlled during operations.

“This accident highlights the importance of train crews communicating conditions affecting the network to network control,” Pelham said.

“It also emphasises the need for train crews operating in areas of restricted visibility to be prepared to stop short of any obstruction on the track.”