Melbourne's Metro Tunnel is now running a full timetable, with more than 1000 extra weekly services added to the network....
Read moreDetailsConstruction is ramping up to remove the level crossing at Maddox Road in Newport, Victoria. This month and next month,...
Read moreDetailsSite investigations are continuing in Seaford, Victoria as part of work to remove another two level crossings on the Frankston Line. ...
Read moreDetailsVictoria’s Level Crossing Removal Project is celebrating the installation of its 1000th U-trough – an innovation that has become central to the...
Read moreDetailsPlanning work is moving forward to remove level crossings at Brunswick and Parkville in Melbourne, with the project referred to...
Read moreDetailsA group of students from local primary schools recently toured the Suburban Rail Loop (SRL) site in Heatherton, Victoria to learn...
Read moreDetailsThe Victorian Government has announced the full timetable for Melbourne’s Metro Tunnel, which will deliver more than 1000 extra weekly services on...
Read moreDetailsV/Line services have been suspended across three train lines today, Monday January 12, as crews assess and repair damage from...
Read moreDetailsThe final stage of Victoria’s Shepparton Line Upgrade has now been completed. During a 45 day construction blitz last December,...
Read moreDetailsV/Line has cancelled train services due to run through fire districts in regional Victoria today, Friday January 9. With temperatures to soar to about 42...
Read moreDetails
© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited
© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited