Newly released figures from Inland Rail show that more than 550 people have worked on the Stockinbingal to Parkes section...
Read moreDetailsPerth's first east-west line connection, the METRONET Thornlie-Cockburn Link, and the Victoria Park-Canning Level Crossing Removal project have reached a...
Read moreDetailsPacific National has a long history of experience helping Australia’s farmers get their grain to port. As the largest hauler...
Read moreDetailsWorks on the Albury to Illabo (A2I) section of Inland Rail have begun in Wagga Wagga with the establishment of...
Read moreDetailsSiemens Mobility has remained at the forefront of battery electric technology globally and stands ready to bring the same technology...
Read moreDetailsInland Rail, construction partners McConnell Dowell, has removed the traffic barriers to allow the flow traffic and pedestrians over the...
Read moreDetailsAlmost 500 people, including nearly 300 locals, have already been employed on the Beveridge to Albury Tranche 2 Inland Rail...
Read moreDetailsCommunity members now have an opportunity to find out how Inland Rail is responding to their submissions on the project’s...
Read moreDetailsThe Victorian Government’s investments in the regional rail freight network are getting more freight on rail and giving industry confidence...
Read moreDetailsAs the race to net zero and climate goals intensify, the transport and infrastructure sectors are primed for transformation. Infrastructure...
Read moreDetails© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited
© 2025 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited