Siemens Mobility is playing a vital role in the transformation of the transport industry in Australia by helping it reach net zero carbon emission targets.
Read More
No open-cut trenches at Glen Waverley SRL works
Early construction of Melbourne’s Suburban Rail Loop (SRL) East is well underway in Glen Waverley, where
Read More
Read More
Safety and reliability with rail vehicle testing
Rail vehicle testing plays a vital role in developing and operating modern railway systems. By implementing advanced test and measurement equipment, engineers and operators can gather precise data and analyse various parameters to ensure the safety, reliability and optimal performance of rail vehicles.
Read More
Read More
Kilmany rail bridge a rare engineering feat
A Victorian first in rail bridge construction is taking place at Kilmany as part of the Princes Highway East Upgrade project.
Read More
Read More
New site for KiwiRail train control centre
The KiwiRail National Train Control centre, which controls train movements across most of the country, has moved into new premises in Wallaceville, Upper Hutt.
Read More
Read More
No more ‘Give Way’ on WA level crossings
A major safety review into Western Australia’s public road, passively-controlled level crossings has recommended removal of all Give Way signs on public road level crossings as active warning controls are put in place.
Read More
Study looks at reopening Tier 3 WA freight line
Agonis Group and Jacobs Australia have been appointed to conduct a study on the recommissioning of sections of Tier 3 freight rail lines in Western Australia’s Wheatbelt region, following a tender process conducted earlier this year.
Read More
Read More
More VLocity trains in the making
The Victorian Government is building more modern V/Line VLocity trains, keeping passengers moving across the state and allowing more trains to run around regional Victoria, more often.
Read More
Read More
Ekka Station not in use for this year’s event
Works are progressing well on Brisbane’s new year-round Ekka station being delivered through Cross River Rail (CRR), with the old station building and platforms demolished, and tracks recently installed over a new 150-metre-long rail bridge that will form part of the new station.
Read More
Read More
Metro Trains urges safety on escalators
Figures released by Metro Trains show that there was an average of 20 slips, trips and falls on escalators per month across Melbourne’s rail network in 2022. There were 225 incidents in total in that period.
Read More
Read More