• About
  • Advertise
  • Subscribe
  • Contact
  • List Stock
Wednesday, April 15, 2026
Newsletter
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
No Results
View All Results
  • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
No Results
View All Results
Home Rail industry news (Australia, New Zealand)

Busy holiday period for KiwiRail

by Joshua Farrell
January 23, 2024
in Contracts and Projects, Freight Rail, Industry Infrastructure, Rail industry news (Australia, New Zealand)
Reading Time: 5 mins read
A A
Image: Kaho Hsieh/Wirestock Creators/stock.adobe.com

Image: Kaho Hsieh/Wirestock Creators/stock.adobe.com

Share on FacebookShare on Twitter

KiwiRail teams delivered significant upgrade initiatives across the country’s major commuter rail networks on time and on target over the summer holiday period.

Temporarily shutting down the lines (block of line) allowed KiwiRail to carry out project upgrades, slip repairs and maintenance work across New Zealand’s metro networks faster, at a time of reduced commuter demand.

In Auckland, there were 89 active worksites across the rail corridor involving more than 1800 people, continuing the upgrade and improvement of the city’s rail infrastructure.

Wellington saw the successful delivery of the largest summer holiday block of line KiwiRail has ever carried out in the region, involving 550 workers across the entire network for the duration of the programme.

Auckland holiday work

Auckland’s metro network saw intensive upgrade and maintenance work on multiple lines across the city according to KiwiRail Chief Capital Planning and Asset Development Officer David Gordon.

“This was one of our biggest Christmas closures ever – with around 1,800 people working at 89 different rail sites across the city,” he said.

“We completed multiple projects and started others that will lift the standard of the Auckland metro network. This will support more reliable services, encourage more people to use the trains and get the network ready for the increased services that will come with the City Rail Link.”

Auckland’s Rail Network Rebuild (RNR) Stage 2 works on the Eastern Line were completed on schedule with Eastern Line services restarting between Manukau and The Strand last week. Services resumed from/to Waitematā (Britomart) Station from yesterday (22 January).

Gordon said the holiday closure also saw a focus on the Western Line – which included slip repairs and the carrying out of the most invasive part of the RNR.

“Between Newmarket and New Lynn, we lifted away the tracks and sleepers and dug a metre below ground level to remove and replace the compacted rock foundations under the tracks. This ongoing work is crucial to enable more reliable and frequent rail services,” Gordon said.

“It’s rewarding to see that our work on the Western Line has already successfully enabled the removal of some speed restrictions.”

Other Auckland work included:

  • Further enabling works for the new Third Main Line and signal upgrades at Wiri
  • Ongoing commissioning of new overhead lines between Papakura and Pukekohe to extend electrification
  • Further City Rail Link program milestones delivered, including significant track and civil work at Waitematā Station, Quay Park and Newmarket.

Wellington holiday work:

Eighteen months of intense planning resulted in the successful delivery of the largest holiday shutdown KiwiRail has ever carried out in the Wellington Region with all lines returning to operation on time.

Gordon said that while important maintenance was carried out during the shutdown, most of the activity related to the Wellington Metro Upgrade Programme – a $700 million programme of works to upgrade existing rail infrastructure and build capacity to support Greater Wellington Regional Council’s plans for rail.

“We hit some significant milestones during this shut down. Some of our key long-term upgrade projects came to a close, while others were kick-started. We appreciate that this work can be disruptive, but it’s our best chance to make progress, and it allows us to keep disruptions to a minimum during the rest of the year,” he said.

With teams working around the clock, major progress was made with the complex re-signalling work at Wellington Railway Station, as well as much-needed work on various tracks, foundations and platforms. This project is a major step towards modernising Wellington’s rail network and will improve operations in what is New Zealand’s most complex railway junction.

Round-the-clock work on the Kapiti Line saw the completion of the last major portion of the Plimmerton Station upgrade project. The upgrade, which included adding a third track and platform at the station, will allow commuter trains that currently run from Wellington to Porirua to be extended to Plimmerton, helping with capacity at peak times. Bridge 23 (just north of Paekākāriki) has also been replaced.

Maintenance on the Hutt Valley Line, largely between Ava Station and Taitā Station was also carried out.

“On the Wairarapa Line, the 572m long Māoribank tunnel had all the track and ballast ripped out (which dated back to the opening of the tunnel in 1955) and replaced with heavyweight rail and composite sleepers,” Gordon said.

“In New Zealand’s second longest tunnel – the Remutaka – our team replaced all 18 kilometres of drainage. This massive effort drove the need to shut this line for 20 days and prepares us to replace the track in this tunnel next summer, which will allow long-standing speed restrictions to be lifted.”

The Wairarapa level crossing update work also began, with the installation of a new concrete track slab on the state highway 2 level crossing at Featherston, eliminating renewal work at this site for generations to come.

“This has been another tremendous effort by the entire team: KiwiRail, our contractors and supporting staff, to move closer towards the goal of providing our customers with a reliable and resilient level of service,” Gordon said.

Urgent inspections on the overhead lines, closing Hutt Valley, Melling and Wairarapa rail lines between 9.30am and 2.30pm on Tuesday to Friday this week are in direct response to an unplanned outage caused by heat and not related to pre-planned block of line work. These are essential to minimise further disruption and must take place in daylight and on closed lines for safety reasons.

4

$25,000

2012 SNORKEL MHP13/35

  • » Listing Type: Used
Location marker The shape of a location marker

Murarrie, QLD

07 3171 1136
MORE DETAILS
1

POA

SNORKEL MHP13AT

  • » Listing Type: New
Location marker The shape of a location marker

Helensvale, QLD

07 3177 1605
MORE DETAILS
11

POA

2021 TADANO AT200 S Super Deck

  • » Listing Type: New
Location marker The shape of a location marker

Lytton, QLD

08 6500 0950
MORE DETAILS
6

POA

2025 HYDREMA MX18G

  • » Listing Type: New
Location marker The shape of a location marker

Bibra Lake, WA

08 6500 0937
MORE DETAILS
Premium Ad
14

POA

2023 TADANO AT 300CG

  • » Listing Type: New
Location marker The shape of a location marker

Lytton, QLD

08 6500 0950
MORE DETAILS
20

$181,390

2020 OMME MONITOR OMME 2100 EP - 21M TRAILER MOUNTED LIFT

  • » Listing Type: Used
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
5

$1,650

ABBEY D758 CHERRY PICKER

  • » Listing Type: Used
Location marker The shape of a location marker

Trentham, VIC

03 9988 9194
MORE DETAILS
16

POA

2023 PLATFORM BASKET MONITOR 1275 LBP - 12.3M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
24

POA

PLATFORM BASKET MONITOR 3315 LBD - 33M HYBRID SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
20

POA

2022 OMME MONITOR 2750RJ STICK - 27M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
16

POA

2021 PLATFORM BASKET MONITOR - 43T ED - 43 M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS
20

POA

2022 PLATFORM BASKET MONITOR 1275 - 12.3M SPIDER LIFT

  • » Listing Type: New
Location marker The shape of a location marker

Seven Hills, NSW

02 8315 3992
MORE DETAILS

Related Posts

Olinga Services offers a wide variety of services, from facilities management to recruitment and labour hire. Image: Olinga Services

Olinga Services joins forces with Clemtech

by Kayla Walsh
April 15, 2026

Olinga Services has announced a new partnership with Clemtech, a leading recruitment specialist with over 27 years’ experience providing technical...

Pacific National transports millions of tonnes of critical freight around the country for its customers. Image: Pacific National

Driving innovation: Pacific National takes driver rostering to the next level

by Kayla Walsh
April 14, 2026

With about 2500 train drivers on the books and some of the most complex labour planning rules in the world...

More than 32 additional maintenance activities will be undertaken in addition to the culvert installation during a planned closure. Image: ARTC

ARTC network to close for upgrades and maintenance

by Kayla Walsh
April 14, 2026

The Australian Rail Track Corporation (ARTC) will soon install four reinforced concrete box culverts to strengthen the resilience of the East-West...

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.
Rail Express is Australia’s authoritative business to business rail publication. Updated daily, Rail Express provides uniquely extensive and comprehensive balanced coverage of breaking news and trends in key areas such as infrastructure, investment, government policy, regulatory issues and technical innovation.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Rail Express

  • About
  • Advertise
  • Latest Magazine
  • Subscribe
  • Contact
  • Terms & Conditions
  • Privacy Policy
  • Privacy Collection Notice

Popular Topics

  • Events
  • Passenger Rail
  • Freight Rail
  • Engineering
  • Safety, Standards & Regulation
  • Operations & Maintenance

Our TraderAds Network

  • Arbor Age
  • Australian Car Mechanic
  • Australian Mining
  • Australian Resources & Investment
  • Big Rigs
  • Bulk Handling Review
  • Bus News
  • Cranes & Lifting
  • Earthmoving Equipment Magazine
  • EcoGeneration
  • Energy Today
  • Food & Beverage
  • Fully Loaded
  • Global Trailer
  • Inside Construction
  • Inside Waste
  • Inside Water
  • Landscape Contractor Magazine
  • Manufacturers' Monthly
  • MHD Supply Chain
  • National Collision Repairer
  • OwnerDriver
  • Power Torque
  • Prime Mover Magazine
  • Quarry
  • Roads Online
  • Rail Express
  • Safe To Work
  • The Australian Pipeliner
  • Trade Earthmovers
  • Trade Farm Machinery
  • Trade Plant Equipment
  • Trade Trucks
  • Trade Unique Cars
  • Tradie Magazine
  • Trailer Magazine
  • Trenchless Australasia
  • Waste Management Review

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
MARKETPLACE
  • Latest News
    • Latest News
    • Victoria
    • New South Wales
    • Queensland
    • Northern Territory
    • Western Australia
    • South Australia
    • Tasmania
  • All Sections
    • Industry news
      • Industry News
      • Appointments
      • Events and conferences
      • Rail industry events
      • Grants and Budgets
      • Regulations
      • Safety
      • Social Governance
      • Sustainability
    • Major Projects & Infrastructure
      • Major Projects & Infrastructure
      • Fast Rail
      • Freight Rail
      • Heavy Haul
      • Heritage Trains
      • Intermodal
      • Light Rail
      • Operations and Maintenance
      • Passenger Rail
      • Plant and Equipment
      • Railway Crossings
      • Rolling stock and manufacturing
      • Track and civil construction
      • Train Stations
      • Workforce
    • Rail Technology
      • Rail Technology
      • AI and Communications
      • Condition Monitoring
      • Cybersecurity
      • Decarbonisation
      • Digitalisation
      • Research and Development
      • Signalling
      • Standards
    • Industry organisations
      • Industry organisations
      • ARA
      • PWI
      • RISSB
      • RTAA
    • Video
  • Rail Directory
  • About
  • Advertise
  • Subscribe
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited